Return to the BUILD
“In this stage, you fit the ammeter and clock to the dashboard upper panel, as well as the spotlight module.”
Contents
Parts
Materials: Everything in this stage is plastic.
Build
Ammeter, Clock & Spotlight Handle
Look at the details on these little parts!
Step 01
First, take note of the keyed slots in each of these gauge holes. The gauges both have tabs that align each one correctly:
Fit the Ammeter into this left-side round opening of the Dashboard Upper Panel:
Secure the Ammeter into place from behind with one (1) EP screw:
Fit the Clock into this right-side round opening of the Dashboard Upper Panel:
Secure the Clock into place from behind with one (1) EP screw:
Step 02
Push the narrow D-shaped end of the Unity S6 Spotlight Handle into this matching hole of the Dashboard Upper Panel, as shown.
This was supposed to be a simple push-fit connection, but the angle is really bad and I snapped this part in not one, but two places at the same time:
Not to worry, I used some super glue gel to fix it right up:
Step 03
Push the two pins of the Hydramatic Quadrant into these holes of the Dashboard Upper Panel, as shown.
This was push-fit as well. Pay attention to the angle of the pins, when inserted, this should sit flush against the dashboard:
Thoughts
Oh boy, so many little parts! I definitely struggled a bit with finger dexterity to get everything installed, especially the Hydramatic Quadrant.
Next Up
Stage 41 – Radio Receiver, Instrument Panel/Box, Switches, Dashboard Trim, Radio/Display