STAGE 59

 Return to the BUILD


“In this stage, you begin assembling the Martin Marietta UHF signal and power distribution unit.”

 

Contents


Parts

Materials: Everything here is plastic.

Magazine – Issue 17

  • Model Instructions
  • Michael Ensign: Ghostbusters’ Hotel Manager
  • Ghost Jogger: The Health-Conscious Apparition
  • Word of Mouth: Diana Hamann
  • Cover Stars: Michael McWillie
  • Ecto-101: The Pneumatic Railway

Build


Martin Marietta UHF Signal

Step 01

Slide two Distribution Unit Side Panels into the matching slots at either end of the Distribution Unit Lower Panel.

The Distribution Unit Lower Panel is the box with the two extra screw posts on the bottom:

The screw posts of the Side Panels should face the interior of the box and there should be these gaps at the top of the tabs, as shown:

Fit the Distribution Unit Central Panel on top of this assembly, as shown:

Secure the Distribution Central Panel to the assembly with four (4) IP screws:

Step 02

In the same way, slide two Distribution Unit Side Panels into the matching slots at either end of the Distribution Unit Upper Panel, as shown:

Thoughts


A nice quick and easy stage this was. The Distribution Unit Top was not used here, but we will need all of these parts in the next stage as we add more details to this assembly.

Next Up


Stage 60 – Astrodate Peripheral Body/Front/Monitor, Martin Marietta UHF Signal Unit Cover/Knobs/Struts

Leave a Reply

Your email address will not be published. Required fields are marked *